Qualität

Startseite » Quality

QUALITY & PROJECT CONTROL

Quality Begins Before Production

We define the technical scope, select an appropriate manufacturing route and coordinate validation and production checkpoints around the requirements of each project.

Clear Inputs

Zeichnungen, Stücklisten, specifications and acceptance criteria.

Qualified Route

In-house or approved external route based on capability and project fit.

Controlled Revisions

Approved requirements and open issues tracked through the project.

Documented Results

Inspection and test evidence defined before production.

PROJECT QUALITY FLOW

Five stages from RFQ review to repeat-order support

Every project starts with its own specifications. The control plan is matched to product risk, application needs, volume and required documentation.

  1. 01

    Requirements Review

    Zeichnungsprüfung, Stücklisten, Materialien, Toleranzen, Mengen, Test, packaging and documentation before quotation and supplier selection.

  2. 02

    Supplier & Process Matching

    Match manufacturing partners according to process capability, equipment, relevant experience, quality controls, capacity, lead time and commercial fit.

  3. 03

    Sample Validation

    Coordinate sample builds against the agreed scope, document inspection results and track open issues and revisions before production approval.

  4. 04

    Production Follow-Up

    Follow defined checkpoints that may include incoming material, in-process, dimensional, functional and final inspection requirements.

  5. 05

    Delivery & Improvement

    Coordinate release documents, Verpackungs- und Lieferanforderungen, issue tracking and corrective-action follow-up for repeat production.

CONTROL POINTS

What may be reviewed during a project

Technical Baseline

  • Zeichnungen, BOMs and specifications
  • Materials, finishes and tolerances
  • Approved samples and revision status

Manufacturing Control

  • Process flow and defined checkpoints
  • Incoming and in-process inspection
  • Workmanship and assembly requirements

Verifikation

  • Dimensional or visual inspection
  • Electrical or functional testing
  • Final inspection before release

Delivery Readiness

  • Packaging and labeling requirements
  • Required reports and records
  • Open-issue and delivery status

CERTIFIED PRODUCTION SITE

IATF 16949:2016 Qualitätsmanagementsystem

The quality management system at the Shenzhen manufacturing site conforms to IATF 16949:2016, First Edition dated 1 October 2016.

Certified scopeProduction of electronic connecting wires (excluding 8.3 product design)
Company and certified manufacturing addressRaum 201, Gebäude C und D, Nein. 3 Yanshan Avenue, Yanchuan Community, Yanluo Subdistrict, Bezirk Bao’an, Shenzhen, Guangdong, China
ZA-FCAV No.2502208/R0S
IATF No.0591621

DOCUMENTATION

Confirmed according to the selected manufacturing route

Available records vary by product and manufacturing partner. Applicable documents are agreed during quotation and project review, so expectations are clear before samples or production begin.

01Inspection plans and reports
02Test results and functional records
03Material and traceability records
04Supplier certificates when applicable

FOR A FASTER REVIEW

Include these inputs with your RFQ

Drawings and BOMMaterials and tolerancesExpected volumesTest or inspection standardsPackaging requirementsRequired documentation

DEFINE THE CONTROL PLAN EARLY

Share your quality and documentation requirements.

We will review the available information and identify the next engineering, supplier and validation steps.

Send Your Requirements

  • ECO ELEKTRONIK